Skip to content
MPACT Athletic Installations

Commercial athletic facility installation

From empty floor
to fully operational.

MPACT coordinates, assembles, places, and completes commercial fitness environments — from equipment receiving through final walkthrough.

  1. 01 Receiving
  2. 02 Inventory
  3. 03 Assembly
  4. 04 Placement
  5. 05 Anchoring
  6. 06 Handoff
STATUSOPERATIONAL
  1. 01New facility buildouts
  2. 02Equipment replacements
  3. 03Renovations
  4. 04Relocations
  5. 05Multi-site rollouts
  6. 06Flooring & turf
  7. 07Manufacturer support
  8. 08GC scopes

Primary capability

Commercial equipment installation.
Handled end to end.

One scope, one crew, one point of accountability — from the moment freight hits the dock to the final walkthrough. Every line below is standard procedure, not an upsell.

  1. 01Delivery & receiving coordinationScheduling with carriers, dock and access planning, staging space
  2. 02Manifest verificationDelivered items checked line-by-line against the equipment manifest
  3. 03Component inventoryCartons, hardware kits, and components counted before assembly begins
  4. 04Damage documentationShortages and packaging or freight damage photographed and reported same day
  5. 05Access & room verificationDoor clearances, elevators, floor protection, and pathways confirmed
  6. 06Equipment assemblyBuilt to the applicable manufacturer instructions for each unit
  7. 07Layout-based placementUnits set to the approved room plan with clearances maintained
  8. 08Anchoring where specifiedApproved anchoring completed per the project plan and manufacturer guidance
  9. 09Adjustment & alignmentLeveling, cable tensioning, and alignment across the equipment line
  10. 10Packaging removalCartons, pallets, and debris staged out or removed per site rules
  11. 11Punch-list completionOpen items tracked and closed before handoff
  12. 12Final walkthrough & documentationCompletion walkthrough with photo documentation of the finished floor
01 / RECEIVED & VERIFIEDM12 × 402 / ASSEMBLED03 / OPERATIONAL

Scope builder

Build your installation scope.

Draft a working scope the way we'd write it on a work order — facility, project type, and the services involved. It saves on this device and pre-fills your project file.

A / Facility
B / Project
C / Services required

Logistics

Installation

Transition

Surfaces

Specialty

Closeout

Process

A controlled process from arrival to handoff.

The same sequence on every project — so owners, GCs, and distributors always know which phase the floor is in and what happens next.

  1. 01

    Scope & plan review

    PLANNING

    Review equipment lists, room layouts, project responsibilities, schedules, delivery information, and jobsite requirements — so the installation scope is defined before anything ships.

    • Equipment manifest reviewed
    • Room layout confirmed
    • Responsibilities defined
    • Schedule aligned
  2. 02

    Site & logistics coordination

    LOGISTICS

    Confirm site access, staging, loading areas, door clearances, elevators, flooring protection, storage, and coordination with other active trades.

    • Access path verified
    • Staging area assigned
    • Protection plan set
    • Trades coordinated
  3. 03

    Receiving & inventory

    RECEIVING

    Compare delivered items against manifests and document shortages, packaging damage, or visible equipment issues — same day, with photos.

    • Deliveries checked against manifest
    • Condition documented
    • Shortages reported
    • Equipment staged by sequence
  4. 04

    Assembly & placement

    INSTALLATION

    Assemble equipment according to applicable manufacturer instructions and place units according to the approved room plan.

    • Units assembled to instructions
    • Placement per approved plan
    • Clearances maintained
  5. 05

    Anchoring & completion

    COMPLETION

    Complete approved anchoring, equipment adjustments, alignment, cleanup, and remaining installation details.

    • Specified anchoring completed
    • Units leveled and aligned
    • Packaging removed
  6. 06

    Punch list & handoff

    OPERATIONAL

    Resolve remaining scope items, organize documentation, and complete the project walkthrough. The room opens with a record behind it.

    • Punch list closed
    • Documentation delivered
    • Final walkthrough complete

Scope definition

Clear scopes. Clear responsibilities.

Installation projects go wrong in the gray areas. This is how we divide the work — what MPACT executes, what qualified specialty contractors handle, and what the project team provides.

A

MPACT installation scopes

Executed by MPACT crews

  • Receiving
  • Inventory
  • Assembly
  • Placement
  • Anchoring where specified
  • Equipment removal
  • Equipment relocation
  • Rubber flooring
  • Turf
  • Reconfiguration
  • Punch-list work
  • Documentation
B

Coordinated specialty scopes

Performed by qualified specialty contractors, coordinated with the project team

  • Court systems
  • Electrical
  • Plumbing
  • Structural modifications
  • Concrete
  • Specialized rigging
  • Aquatic systems
  • HVAC & dehumidification
  • Other licensed trades
C

Project-team inputs

Provided by the owner, GC, or design team

  • Approved layouts
  • Final equipment schedule
  • Site access
  • Utility readiness
  • Structural information
  • Delivery schedule
  • Protected storage
  • Trade coordination
  • Final approvals

Regulated trade work is performed by appropriately qualified contractors. Scope boundaries are confirmed in writing for every project before work begins.

Surface systems

Flooring and turf are systems, not finishes.

What's under the surface decides how it performs. Step through the section — every layer is part of the installed system, and every layer is sequenced against the equipment plan.

Flooring & turf scope
  1. Rolls, tiles, or interlocking rubber and turf zones placed to the room plan — lanes, inlays, and markings included.

SECTION A—A / ATHLETIC SURFACE SYSTEMCONCRETE SUBSTRATERUBBER 10MMTURFSEAMTRANSITIONRACK UPRIGHTANCHOR PER SPECEDGE

Industries

Different rooms. Different constraints.

An amenity floor in an occupied tower is not a franchise gym, and neither is a university weight room. What changes is the logistics — the process stays controlled.

  • A club opening is a fixed date with a marketing campaign behind it. Equipment arrives in waves from multiple suppliers, the floor plan has been revised twice, and pre-sale members expect a finished room. These projects reward an installer who tracks every delivery against the schedule and closes out cleanly.

    Project concerns

    • Opening-date schedules

      Installation sequenced backwards from a committed open date

    • Multi-supplier deliveries

      Strength, cardio, and accessories arriving on separate trucks and dates

    • Layout fidelity

      Sales-floor plans executed as approved, with clearances kept

    • Member-ready finish

      Adjusted, aligned, wiped down, and debris-free at handoff

    • Warranty-safe assembly

      Built to manufacturer instructions unit by unit

    Commercial Fitness projects

Commercial partners

Built to work inside a larger project.

General contractors, developers, distributors, manufacturers, franchise groups, and facility operators bring MPACT in as the fitness-installation scope — and get a sub that behaves like part of the project team.

01Defined installation scopes
Inclusions, exclusions, and required inputs in writing before mobilization.
02Schedule coordination
Installation slotted against your master schedule and other trades.
03Documentation
Receiving reports, condition photos, and completion records per project.
04Site-condition reporting
Access, readiness, and blocking issues raised the day they're found.
05Delivery-issue reporting
Shortages and freight damage documented while claims are still viable.
06Punch-list accountability
Items tracked to closure and verified — not disputed at the end.
07Project-team communication
One responsive channel for supers, PMs, and program managers.
08Multi-site execution
The same procedure and reporting at every address in a program.

Start a project

Tell us what is arriving,
where it is going,
and when it needs to be ready.

Open a project file with whatever you have — a full manifest and stamped drawings, or an equipment quote and a target date. We’ll build the rest of the picture with you.