Skip to content
MPACT Athletic Installations

Capability 04 — Transition scope

Relocation & Removal

Facilities change: leases end, rooms get reprogrammed, equipment gets replaced or redistributed between sites. MPACT handles the physical transition — disassembly, protected transport coordination, reinstallation, and reconfiguration — with the same inventory and documentation discipline as a new installation.

Scope of work

What this scope includes.

Line items are confirmed per project — inclusions and exclusions in writing before mobilization.

  1. 01Equipment removalDisassembly and removal of units marked for disposal or return
  2. 02Decommission inventoryRemoved equipment cataloged for resale, return, or transfer decisions
  3. 03RelocationDisassembly, protection, and reinstallation at the destination
  4. 04Facility reconfigurationRooms re-laid to a new approved plan using existing equipment
  5. 05Anchor remediationAnchor locations addressed per project direction when equipment moves
  6. 06Surface protectionFloors and finishes protected along every move path

On the plan

The same plan discipline applies when equipment moves out, across the room, or across town.

STATUSINSTALLATION

Field notes

How we run this scope.

01

Every unit accounted for

Removals produce an inventory, not a pile. Each unit is tagged and listed so owners can decide what transfers, sells, or returns — with a record to work from.

02

Occupied facilities stay open

Reconfigurations are planned in phases with the operator so member-facing areas stay usable while the floor changes around them.

Ready to open a project file?

Start with whatever you have — an equipment quote, a layout, a target date. The intake takes minutes and nothing is lost between visits.